Home › Contact
Get in touch

Quotation within 12 working hours

Give us voltage, material, output and destination port and you get a real number back — FOB price, packed volume, lead time and what your port requires to clear.

WhatsApp+86 186 8151 4156 — fastest route, we answer during China business hours (GMT+8) and usually outside them too.
Email[email protected] — good for drawings, specification sheets and anything you want in writing.
OfficeNo. 88, Buhua Road, Buji Street, Longgang District, Shenzhen, Guangdong, China

Send us the six things we need

Every one of these changes the machine or the price. That is why we ask instead of assuming.

  • Voltage and frequency at your site — 220V/380V/415V, 50 or 60 Hz, single or three phase
  • Raw material: maize, soybean, rice husk, straw, napier grass, alfalfa…
  • Output you need, per hour or per day
  • Die hole size for pellet mills — 2.5 to 8 mm depending on animal
  • Destination port, so we can check certificate requirements
  • Quantity, and whether you want spare wear parts in the same shipment
Prefer to talk? WhatsApp +86 186 8151 4156
Email [email protected]

We reply within 12 working hours. Your details are used for this inquiry only.

✓ Thank you — your inquiry has been received. We reply within 12 working hours, usually much faster on WhatsApp.
Terms

Payment, lead time, shipping

Payment terms

30% deposit, 70% against a copy of the bill of lading, by T/T bank transfer. Spare-part and sample orders are prepaid in full. We do not accept card payment for machine orders — the amounts are too large and the chargeback risk on both sides is not worth it.

Lead time

7–25 days for standard models once the deposit clears and the voltage is confirmed. Motor windings to a non-standard voltage add about a week. We tell you the real date at quotation, not after you pay.

Shipping

Single units ship LCL in a fumigation-free plywood case. A 260-type pellet mill is about 1.1 CBM and 380 kg net. We quote FOB Shenzhen and can arrange CIF to your port if you prefer one invoice.

Warranty & spares

12 months on the machine, excluding wear parts. Dies, rollers, hammers and screens are consumables — we keep them in stock and ship within 3 days, separately from any machine order.

Certificates — check before you order, not after. The Philippines and Vietnam require no pre-shipment certification for these machines. Kenya and Tanzania require PVoC, Nigeria requires SONCAP, Saudi Arabia requires SASO. These add cost and time that vary with order value. Tell us your port and we will state exactly what applies before you commit.